The proposed project would move the compressed air system from it's current location to a new 500 sq. ft. compressor building that would be located…
New office trailers are to be installed in G-Area to support Savannah River Remediation personnel.…
Site Construction services to perform 703-41A building improvements.…
The contractor will install and remove scaffolding, operate aerial lifts, provide supplies, equipment and material storage trailers in the work area to support execution.
Building will utilize existing Rapid City utilities and existing access roads.…
This ECP is for the remodel of the former MFC-752 cafeteria. In FY-21, the MFC Cafeteria was relocated from MFC-752 to MFC-1747.…
The scope of the Warehouse Upgrade Project includes demolition of the concrete floor slab to install plumbing piping and minor interior demolition.
Due to the need for increased efficiency in accessing the Material Access Area (MAA), a modification for the 105-K Entrance Control Facility (ECF) …
Replace Tile Flooring, Sinks, Countertops, Toilets, General Refurbish 105-K plus 15 Men's Restroom.…
Upgrade aging electrical infrastructure in the B28 electrical vault to address clearance and arc flash issues, bring vault into code compliance wit…