SRNS will perform onsite project management services and will be responsible for the installation of fiber (FedNet), construction of a new domestic…
New doublewide trailers (2 ft x 69 ft) have been purchased to provide additional space for engineering personnel.…
The scope of the project is proposed to alter the existing upper CSR area with minor regrading to place gravel for the parking area and ingress-egress driving aisles.
Expand the existing NETL electric vehicle charging stations, installing new charging station equipment, electrical cabling and signage.…
The Specific Manufacturing Capability (SMC) has identified the need for design and construction of a modern facility (TAN-1619) to support existing…
A concrete pad and pre-fabricated picnic shelter will be erected at the SREL Conference Center.…
Install Pizza Ovens in 766-H.…
Renovate 211-8H Lunch Room with new flooring, ceiling tile, paint and appliances.…
Tritium currently has personnel in F-Area, E-Area, and the trailer complex in G-Area just outside of H-Area. A New Tritium Office Building is neede…
The proposed facility will be constructed at the Live Fire Range and be constructed as a multi-use building with an estimated occupancy of 20 perso…