The US Army Corps of Engineers (USACE) will subcontract the final design and construction of Barricade 9 Entry Control Facility (ECF) replacement.…
Revision 3: The tie in to the existing 3 in. potable water main has changed. The new tie in location will be near Bldg. 724-36E.…
The RCB building or support systems to the laboratory may be modified to support on-going needs of staff or research projects.…
Install 2 mini mobiles in the NW 703-A Parking lot.…
This project is being pursued in efforts to support a future mission to provide a location with the infrastructure and capability to perform system…
This revision addresses the addition of a hydrogen purification and compression system to the 250 kW Solid Oxide Electrolysis Cell (SOEC) hydrogen …
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to site, construct, modify, and operate small-scale support build…
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to site, construct, modify, and operate small-scale support build…
The scope of the Bettis J-Building Mezzanine Project is to design, fabricate, and install a mezzanine with two sets of access stairs around the inside perimeter of the Bettis J-Building to accommodate relocation and upgrade of the large hot isostatic...
DOE-ORP and BNI propose development of new land areas for infrastructure supporting construction of the HLW Facility.…