Additional equipment storage is needed at the ATR facility for tools, fire protection equipment, barriers, fans, heaters, etc. The proposed work sc…
Proposed activities would include administrative records storage and maintenance and routine operations and maintenance of equipment and assets.…
Install 50'x100' Covered shelter. Including power for lighting/equipment connections, security fence, oil/water separator, and new security cameras…
A new "commodities center" warehouse (and parking area) will be installed in K-Area in support of the K-Interim Surveillance (KIS), Surplus Plutoni…
The proposed activity consists of two projects: Building 760-1G side building deck will be refurbished. Building 760-4G "Old Physical Fitness Gym"…
Install new restroom trailer to replace existing 704-11K restroom trailer.…
Installation of two new double-wide trailers in N-Area.…
Installation of new metal building in the former location of 773-69A and 773-70A.…
Installation of a walking/cart path in-between 704-J and 221-J and another walking/cart path south and west of 704-J to an installation of a rad co…
Remove/Replace Flooring, Install Insulation, Sheetrock, and Paint in 711-1K Fitness Room…