Phase 1: Design...Phase 2: Construction…
The proposed stormwater and industrial water improvements are designed to meet current industrial permit limits and prepare for future development at the Bettis Laboratory Site.
Two Quonset Huts are to be installed in Z-Area to support construction activities.…
The Bonneville Power Administration (BPA) proposes to relocate the calibration, metrology, and chemistry laboratories from the aging South Ampere B…
A new Nurse Station is to be installed and operated in Building 766-H, Rooms 1061 and 1066F for Savannah River Mission Completion employees.…
N and HS personnel will be conducting 500KW generator testing over the course of the next two to three years with approximately 500 hours of operat…
Demolish existing Devil's Lake Crew Quarters and Garage and design and build a replacement.…
DOE’s Office of Clean Energy Demonstrations (OCED) is proposing to provide funding to X-energy (XE), under the existing cooperative agreement, to r…
In October 2020, the U.S. Department of Energy’s (DOE) Advanced Reactor Demonstration Program entered into a cooperative agreement with X‐energy fo…
The KS Firehouse Replacement project will provide proper facilities and space required to support emergency services organizations and better enable them to fulfill their role in managing Kesselring Sites (KS) 3905 acres.