Tritium currently has personnel in F-Area, E-Area, and the trailer complex in G-Area just outside of H-Area. A New Tritium Office Building is neede…
The proposed facility will be constructed at the Live Fire Range and be constructed as a multi-use building with an estimated occupancy of 20 perso…
The system will be upgraded, fully replaced, or enhanced.
SRNS Emergency Management will install two new tornado shelters in B-Area. The new structure numbers will be 707-66B and 707-67B.…
A 50 ft x 100 ft compacted gravel training pad is needed on the north side of the SMC fire station (TAN-687) for vehicle extrication training and r…
The proposed parking lot changes would provide more employee parking stalls, create a heavy equipment staging area, a contractor vehicle queue for …
Utilization and modification of 706-3F, 2nd floor to perform engineering classified computing task to support NNSA missions.…
The mission of the National Reactor Innovation Center (NRIC) is to accelerate the demonstration and deployment of advanced nuclear energy.…
A new Power Utility Operations Building will consolidate all Power Management personnel, equipment and Supervisory Control and Data Acquisition (SC…
The specific objective of the project is to complete design, specification, engineering, procurement, manufacturing, quality assurance, testing, an…