The entire 3-story, 32,355 square feet, building interior will be reconfigured to serve as a training facility to meet current and upcoming functional needs.
The US Department of Energy (DOE) proposes to upgrade Bldg. 59 ("Shyh Wang Hall," formerly "CRT") at the Lawrence Berkeley National Laboratory (LBN…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to Klickitat Valley Health in Goldendale, WA to ma…
The Remote Sensing Laboratory–Andrews (RSL-A) would conduct flight operations using assets launched or deployed from facilities that support those …
This funding will address the layout of the existing warehouse dock and other site concerns, such as drainage. It will create a more functional app…
The US Army Corps of Engineers (USACE) will subcontract the final design and construction of Barricade 9 Entry Control Facility (ECF) replacement.…
Revision 3: The tie in to the existing 3 in. potable water main has changed. The new tie in location will be near Bldg. 724-36E.…
The RCB building or support systems to the laboratory may be modified to support on-going needs of staff or research projects.…
Install 2 mini mobiles in the NW 703-A Parking lot.…
This project is being pursued in efforts to support a future mission to provide a location with the infrastructure and capability to perform system…