The purpose of the CRC Project is to consolidate all monitoring and control functions from the F-Tank Farm control rooms to the 241-2H Control Room…
Installation of a double-wide trailer in E-Area. This revision includes the installation of a sidewalk along building 704-75E.…
Contractor shall furnish all supervision, labor, materials, tools, and equipment necessary to perform interior and exterior building upgrades to WH…
Bonneville Power Administration (BPA) proposes to construct the Vancouver Control Center (VCC) project at the J.D. Ross Substation and Regional Ope…
Bonneville Power Administration (BPA) proposes to construct the Vancouver Control Center (VCC) project at the J.D. Ross Substation and Regional Ope…
This project will provide temporary modular office space which shall include site preparation, general facility infrastructure, HVAC, electrical, d…
A new carport/canopy will be installed south of 730-4B for unloading materials.…
SRNS will perform onsite project management services and will be responsible for the installation of fiber (FedNet), construction of a new domestic…
New doublewide trailers (2 ft x 69 ft) have been purchased to provide additional space for engineering personnel.…
The scope of the project is proposed to alter the existing upper CSR area with minor regrading to place gravel for the parking area and ingress-egress driving aisles.