DOE LM is proposing to move approximately 17 full-time equivalent (FTE) Legacy Management Support (LMS) employees from the Delta Building at Harrison, Ohio to the Environmental Quality Management (EQM) building located in Cincinnati, Ohio.
The primary scope of this project is to replace the existing Materials and Fuels Complex (MFC) industrial wastewater pipeline flume with a new flum…
Relocate employees out of trailers to B17, relocate the smoking shelter, prepare the site for removal of trailers, and complete site restoration af…
Establishment and operation of a Rapid COVID Testing Station outside of 735-4B.…
KESSELRING SITE MARF DEFUELING AND ASSOCIATED DEFUELING FACILITY PROJECT
The U.S. Department of Energy (DOE) proposes to install a temporary tensile (tent-like) structure on the existing demolished Building 7 site to pro…
The Kesselring Site D1 G Ditch Remediation Project will remediate soil that is contaminated with silver, mercury, and polychlorinated biphenyls (PCBs), identified in the D1 G Ditch during characterization efforts, to agreed upon cleanup standards.
HMIS Annual Categorical Exclusion (CX) B1.15, Support Buildings for CY 2022…
Modify 717-K Limited Area Pocket…
Per the House of Representatives Appropriations Act, 2020, dated January 2020, a new Protective Force Security Building is being constructed at MFC…