Central Plateau Cleanup Company (CPCCo) and its subcontractors perform siting, construction or modification, and operation of support buildings and…
Renovations are needed in Building 246-H. Enhancements will be made to flooring, common areas, and exterior signage.…
DOE LM is proposing to move approximately 17 full-time equivalent (FTE) Legacy Management Support (LMS) employees from the Delta Building at Harrison, Ohio to the Environmental Quality Management (EQM) building located in Cincinnati, Ohio.
The primary scope of this project is to replace the existing Materials and Fuels Complex (MFC) industrial wastewater pipeline flume with a new flum…
Relocate employees out of trailers to B17, relocate the smoking shelter, prepare the site for removal of trailers, and complete site restoration af…
Establishment and operation of a Rapid COVID Testing Station outside of 735-4B.…
KESSELRING SITE MARF DEFUELING AND ASSOCIATED DEFUELING FACILITY PROJECT
The U.S. Department of Energy (DOE) proposes to install a temporary tensile (tent-like) structure on the existing demolished Building 7 site to pro…
The Kesselring Site D1 G Ditch Remediation Project will remediate soil that is contaminated with silver, mercury, and polychlorinated biphenyls (PCBs), identified in the D1 G Ditch during characterization efforts, to agreed upon cleanup standards.
HMIS Annual Categorical Exclusion (CX) B1.15, Support Buildings for CY 2022…