The Kesselring Site Building 81 Heating, Ventilation and Air Conditioning (HVAC) project consists of replacing the Test, Recording and Monitoring Room, Computer Room, Air Conditioner units, Air Handling Unit (AHU) and Condensing...
This NEPA Amendment consists of the construction and operation of a new aboveground fire water storage tank and pump house.…
Construction of Pre-manufactured Modular Offices and Restroom Building Near CCO Storage Pad, K-Area.…
Relocation of Drive-Thru Rapid COVID Testing Station from B-Area (735-4B) to N-Area (719-5N).…
Install three Willscot 40 ft. X 8 ft. Container Office Combo Units on the concrete pad (No. 710-A), located on the west end of building 730-A.…
This Environmental Compliance Permit (ECP) is to modify the current air compressor system at MFC-782.…
SRSCRO will demolish modular office building 704-16S after removal of all universal waste and dispose of demolition debris in the C
The scope of the Component Test Complex project includes constructing a new facility and utility infrastructure required to support the Bettis Laboratory Thermal Hydraulics Laboratory testing which is currently located at Bettis in the Hangar 2 Building.
New office trailer is to be installed in G-Area to support Savannah River Remediation personnel.…
The purpose of this project is to establish a storage area for Relocatable Storage Units (RSUs).…