Construction of Pre-manufactured Modular Offices and Restroom Building Near CCO Storage Pad, K-Area.…
Relocation of Drive-Thru Rapid COVID Testing Station from B-Area (735-4B) to N-Area (719-5N).…
Install three Willscot 40 ft. X 8 ft. Container Office Combo Units on the concrete pad (No. 710-A), located on the west end of building 730-A.…
This Environmental Compliance Permit (ECP) is to modify the current air compressor system at MFC-782.…
SRSCRO will demolish modular office building 704-16S after removal of all universal waste and dispose of demolition debris in the C
The scope of the Component Test Complex project includes constructing a new facility and utility infrastructure required to support the Bettis Laboratory Thermal Hydraulics Laboratory testing which is currently located at Bettis in the Hangar 2 Building.
New office trailer is to be installed in G-Area to support Savannah River Remediation personnel.…
The purpose of this project is to establish a storage area for Relocatable Storage Units (RSUs).…
The purpose of this ECP is to address the environmental impacts of replacing the Big Shop's current spray booth with a new, larger, more modern spr…
Tritium operations stores used fluorescent lamps and lead acid batteries outside in a gravel laydown area between Buildings 238-H and 248-H.…