Modification of existing support trailer 211-22H to include painting, new flooring (carpet and rubber tile), enclosing interior window, and install…
An additional area in support building 248-H will be modified to accommodate additional office space.…
Install two (2) metal Quonset Huts to support the construction workforce in S-Area Laydown Yard.…
Attach approximately 1,056 square feet of 4’ X 8’ sound absorbing acoustical tiles on walls in Buildings 730-B (Rm 333), 730-2B (10'x20' room) and …
The project proposed the purchase of a 7KW diesel generator rather a 7KW gasoline generator due to durability and higher quality.…
They would now like to proceed with a scaled down version of that brine storage/fill station. …
BPA proposes to fund the Washington Department of Fish and Wildlife (WDFW) to conduct ongoing operations and maintenance of the Scotch Creek Wildli…
BPA proposes to fund the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to conduct ongoing operations and management throughout abo…
J-Building Cryogenic Liquid Bulk Tank Replacement Project
Repair fire/water damage in the high-bay area and portions of the attic and roof in Building 28.…