Three new trailers and a quonset hut fab shop will be installed to support construction personnel/activities to be located south of the 190 and 186…
This activity is needed for the placement of two (2) 44' x 52' concrete pads and three (3) sealands (263-289H, 263-290H, and 263-291H).…
The Electric Power Research Institute (EPRI) proposes to perform in-reactor testing and post-irradiation examination (PIE) of piezoelectric acousti…
This project would expand the productions areas at Ml-8.…
The University of California Berkeley (UC Berkeley) proposes to measure energy-differential neutron-induced reaction cross sections and use the res…
Project activities will support the Experimental Breeder Reactor II fuel movements from the Idaho Nuclear Technology and Engineering Center (INTEC)…
Remove existing roof layers of Building 6 (except roof decking) and replace with new roofing materials.…
Award Number: DE-EE00008279, CX(s) Applied: A9, B1.15, B5.5, B5.21, State Energy Program, Location(s): AL, Office(s): Golden Field Office
This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste
Purchase, install and operate two modular office units located within the Idaho Nuclear Technology and Engineering Center (INTEC) Facility.…