This revision addresses new proposed locations for excess soil placement. …
Construction for the 11-102 Mobile Test Bed Capability Project.…
Construct a new 10,000 square foot light manufacturing facility at Technical Area 53.
Office work
This EEC supports the installation of a pre-fabricated "Butler" style building to serve as the SRNL Construction Shop per the design input document…
Install Handi-Houses (approx. 3) outside and south of Assembly and outside and west of Disassembly in K-Area.…
MSA/HMIS to perform siting, construction or modification, and operation of support buildings and support structures (including, but not limited to,…
704-S Rooms 78, 80, 82, 83, 83A, 83B, and 85 will be remodeled to function as stand alone offices with work to include framing, drywall repair and …
Design, construction and operation of the Advanced Fabrication Facility (AFF), which would be located in the southwest end of Zone 11.…
Construction to pour concrete pad for outdoor unit installation East side of 704-72S and install Ductless Heat Pump on pad and install three High W…