Utilize and modification of 706-3F, 2nd floor to perform engineering classified computing task to support NNSA projects.…
Install phone boxes/locker units and canopy cover southwest of 704-23K for personnel to deposit cell phones prior to entry into the K-ProtectedArea…
A new air compressor was installed on the existing air compressor pad on the west side of 217-3H in early 2019.…
CH2M HILL Plateau Remediation Company (CHPRC) and its subcontractors perform siting, construction or modification, and operation of support buildin…
The purpose of the proposed action is to promote safer traffic flow at the MFC complex through rerouting all delivery traffic away from the parking…
Install a second Quonset Building in the gravel parking lot north of the K-Area main parking lot and a Quonset Building in the K-Area ConstructionF…
During a preconstruction meeting, it was identified that approximately 5,000 yards of excess topsoil will be removed from the MFC parking lot to ma…
This EC revision includes a handful of scope additions. …
The purpose of this Environmental Checklist (EC) is to address the redesign and installation of the new Advanced Test Reactor (ATR) Low Pressure Ai…
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of
the property and subsequent demolition, remova...
the property and subsequent demolition, remova...