BPA proposes to fund the Nez Pece Tribe to replace two, side-by-side, 8-foot-wide culverts on Big Elk Creek on county-owned lands approximately one…
BPA is proposing to fund the Kalispel Tribe of Indians to purchase the Greyback Mountain property, a 240-acre parcel of land located roughly 7 mile…
BPA is proposing to fund the Kalispel Tribe of Indians to purchase the Rocky Gorge property, a 120-acre parcel of land located roughly 8 miles sout…
JAX LNG, LLC (JAX) filed an application with the Department of Energy’s (DOE) Office of Fossil Energy and Carbon Management (FECM) on July 25, 2024, pursuant to section 3 of the Natural Gas Act (NGA) and 10 CFR Part 590 of DOE’s regulations.
Stratigraphic test well drilling and geologic data collection on Titan Pennsuco Plant property in Medley, FL.…
Rebuilding of 8.62 miles of the Northeast NPPD sub-transmission system. Activities would include replacement of existing power poles and conductors…
Construction of 6 miles of new three-phase 12.5 kV distribution underground power line connecting two substations (Huntsville to Fisher, MN). The i…
The project will replace 7.25 miles of three-phase overhead distribution line with new, three-phase underground line to increase the resilience and…
Install and replace a three-phase 75 KVA transformer on Kennedy Rd and Flying Tiger Way. Install and replace a three-phase 75 KVA transformer on Ch…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Public Service Commission of Wisconsin (PSCW) for a horizontal g…