From US 27 and Carpenter St. starting at pole 209683, we are installing a new pole and installing our primary lines underground southwest to South …
BUECI plans to replace the gearbox on their existing Taurus generator which provides critical backup power for the community. …
Transfer of Tugger Truck to PECMC. …
730-1B Renovate lobby area.…
The objective of this project is to improve the reliability and resilience of the electric distribution grid for the public through three undergrou…
Bonneville Power Administration (BPA) proposes to provide funding to support implementation of the Yakama Nation Fisheries (YNF) Lower Wenatchee Ri…
105-C Assembly has some locations inside and outside with damaged panels and damaged outer area flashing. Transite panels containing asbestos are p…
The 704-60E trailer currently does not have a PA amplifier for its speakers and relies on amplifier in another trailer. The proposed activity is to…
Funding will support the project team's small-scale research and development of an advanced ultra-conductive carbon aluminum composite (UCAC) cable with superior electrical and mechanical properties, applicable to electrical power transmission and distribution, including utility-scale infrastructure, renewable energy integration projects, and the development and modernization of grid systems.
Water and Ethylene Glycol mixture from Drum 6 in 211-9F will be drained into Sanitary Sewer for treatment at Central Sanitary Wastewater Treatment …