This evaluation covers operation, maintenance, and installation of solvent extraction equipment and centrifugal contactors used for solvent extract…
HVAC-FAN-D8 in the small outside courtyard of Building 735-A needs to be replaced due to age and deterioration.…
Induction Melter technology will be used to test various glasses for technology compatibility of waste glass vitrification.…
Calcium carbonate will be electrochemically decomposed to prepare calcium hydroxide and subsequently calcium oxide.…
TS/Repair Fuel Oil Heaters at Building 711-N…
Subcontractor will provide roof repairs at 763-52N.…
In this final rule, DOE is adopting new and amended energy conservation standards for walk-in coolers and walk-in freezers. DOE has determined that…
The U.S. Department of Energy (DOE) is proposing to administer funding to Ashta Enterprises LLC dba Bula Forge and Machine, Inc. to install a roof-…
In this final rule, DOE is adopting new and amended energy conservation standards for expanded scope electric motors. DOE has determined that new a…
The proposed work activity is to relocate a portable shed from a storage area between Buildings 211-9F and 235-F to the East wall of Building 707-1…