Evaluate, correct, and overhaul chiller No. 2 and return to normal working conditions in HB-Line.…
Storm drain piping in 105-L will be replaced.…
Reactor slugs and surrogate materials will be dissolved and tested in SRNL for off gas testing. Solution preparation and mock-up testing will be co…
Development of ionic liquids will be investigated in 935-W. Major activities include synthesis of ionic liquids (IL) with varying cation and anion …
Replace approximately 5,121' of conductor from overhead to underground. Additionally, 8,800 feet of conductor will be replaced with newer single-ph…
Bonneville Power Administration (BPA) proposes to replace in-kind, wood pole structure 10/6 and associated structural/electrical components (e.g., …
Bonneville Power Administration (BPA) proposes to remove, replace, or retire approximately 14 marker balls on the Schultz-Raver No.1/Schultz-Echo L…
Bonneville Power Administration (BPA) proposes to improve four water crossing features and to widen the access road to accommodate the water crossi…
DOE and the DOE DOGE Team identified a land asset located in Illinois which DOE had acquired to support an energy-related project which has since b…
Site preparation and restoration for utility pole replacement - removing utility poles that are over 30 years old and structurally compromised, ove…