Update all lighting fixtures to LED throughout the facility at 716-N.…
The scope of this activity will be to install blanks to Vessel 6.8E and 7.7E for cooling water and steam at 221-H. Blanking cooling water and steam…
Operation and maintenance of the LECO Carbon/Sulfur. This method determines the concentration of carbon/sulfur in small lab samples.…
Installation of mesh pole wraps to mitigate wildfires. …
Vegetation management within Right-of-Ways. Thirty miles of copper conductor replacement. Replacement of electric poles. …
The primary flight test site is at the Idaho National Laboratory (INL) Unmanned Aerial Systems (UAS) B16-710 runway and facility B16-612 and includ…
Replacement of approximately 90 wooden power poles with steel poles. Pole top covers are to be installed at various locations along with vegetation…
Venting gas cylinder bottles for the disposal of lecture bottles thru recycling in A-Area hoods.…
There are three legacy tanks, in two vaults at SMC, that will be removed to repurpose the areas for future SMC projects. The tanks are TK-BA-107, T…
This ECP only pertains to Section 110 activities carried out by the INL CRMO. CRMO Activities: Test excavations, surveys, monitoring and data recor…