The American Electric Power's (AEP's) Buckrun Switch to West Crawford 69 kV Transmission Line Rebuild Project will rebuild approximately 6.12 miles of existing linear transmission line infrastructure generally within its existing 60-foot-wide right-of-way (ROW) between the existing Blanchard Station and West Crawford Station (main line) and between the main line and South Vanlue Station, in Hancock and Wyandot counties, Ohio.
Funding will support the project team's small-scale research and development of smart screens that can automatically control fluid flow in enhanced geothermal systems (EGS) based on temperature by overcoming the challenges of premature thermal breakthrough and non-uniform heat extraction by enabling autonomous, temperature-based flow control without complex electronics or chemical treatments.
Funding will support the project team's small-scale research and development of gaseous optical elements technology for the purpose of manipulating high-power lasers for future laser-driven nuclear fusion power plants.
This Programmatic NEPA CX will cover all activities under Substation Stabilization Priority Projects, Repairs to Transmission Facilities, Priority …
Overhead to underground conversion of approximately 6 miles of power lines. …
New 3-phase underground power line (approx. 0.5 mile), a new cable installed by boring under the Pen Oreille River (approx. 0.25 mile), and the reb…
Prep and apply Cool Seal to roll-up doors 1 and 2 at 705-C.…
Generators for use greater than 12 months to be added as insignificant activities.…
At the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit (OU), one existing monitoring well (CMP 50B) has been determined to be compromise…
Maintenance will replace the packing material in the M-1 Air Stripper Column.…