730-B Seal the outside windows on the 2nd and 3rd floor.…
Activities involving final deactivation and decommissioning (D and D) of multiple D-Area buildings. This revision incorporates the adding of demoli…
Replace totalizer in 235-F Stack.…
The U.S. Department of Energy Office of Legacy Management (LM) owns and manages an extraction and monitoring well network adjacent to the Shiprock,…
Collecting 20-miles across 4-lines of 2-D surface seismic data.…
This project will include vegetation management in the right of ways (ROW) identified in the map provided and in 69.77 miles of ROW. The work will …
Mason PUD 3 is upgrading it's Pioneer Substation from a 25 MVA unit to a 40 MVA unit along with new relay panels that will allow higher electric lo…
Bradford Township replacement of existing Electric Substation facility will include excavation of a grounding grid, poured cement piers for substat…
The project objective is to develop a system engineering approach for produced water resource extraction and management in oil and gas operations.…
Installation of electronic reclosers. The majority will be installed on existing poles within rights-of-way while some instances of new poles withi…