The proposed actions would include baseline water quality testing in accordance with the U.S. General Services Administration Order PBS1000.7A, Dri…
The scope of work for this task is to Apply FireDam to fix contamination at the Transuranic Waste (TRU) Processing Facility located at Low Activity…
Three gates have gate position and locking pins that require maintenance. The scope of work will include maintenance and modifying the gate locking…
Roof Repair in 702-L…
Add new restroom at 760-11G.…
706-1F/8F parking lot lighting feed needs to be replaced because a short was discovered in the existing feed. Existing feed will be abandoned in pl…
This generic EEC describes the environmental impact of the activities generated by MT-TRI-2024-00010, MT-TRI-2024-00011, MT-TRI-2024-00013, and MT-…
The Grid Defense Project consists of substation and circuit improvements in Fort Smith, Sebastian County, Arkansas by installing new automation and…
At Bruce Henry Solar Farm: Install Two (2) Battery Energy Storage units and associated electrical equipment on existing property.…
Activities include the inspection of circuit 968530 to identify encroaching vegetation. …