The U.S. Department of Energy (DOE) is proposing to provide Congressionally Directed Spending to the Grand Traverse Regional Land Conservancy (GTRLC) for the installation of a 1.15 megawatt battery energy storage system (BESS) at the GTRLC Headquarters in Traverse City, Michigan.
Overhead to underground conversion for approximately 4 miles of powerline. …
Project will develop, deploy, and demonstrate an advanced solid-state transformer system for a water pumping application.…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the University of New Hampshire (UNH) for the design, fabrication, and testing of ultra-high-performance concrete (UHPC) for use in wave energy converter hulls.
Planned activities include the construction of a new 24-inch steel natural gas pipeline spanning approximately 3.75 miles along the existing PREPA …
Installation of battery energy storage systems of various sizes at five sites: Site 1 - Ooltewah, TN, Site 2 - Signal Mountain, TN, Site 3 - River …
This revision is for Oklo to install temporary power lines to the Aurora-INL project site, install a production well at the Aurora-INL site, and utilize an MFC construction water supply source to provide water to support Aurora-INL limited construction activities.
The proposed project includes the construction of five 138 kilovolt (KV) transmission lines totaling 3.5 miles of new 100-foot right-of-way (ROW) and the rebuilding of approximately 0.4-mile of existing 100-foot 138 kV transmission line ROW.
The Project will rebuild approximately 24.7 miles of existing linear transmission line infrastructure generally within its existing 100-foot-wide right-of-way (ROW) between the existing Duncan Substation and Cox City Road, in Grady and Stephens counties, Oklahoma.
The U.S. Department of Energy's (DOE) Wind Energy Technologies Office is proposing to provide federal funding to Uprise Energy to complete testing of a prototype wind turbine.