Install a prefabricated building immediately north of the existing metal building. Reroute the existing conductors from the existing building to th…
his study will identify near-term upgrades that incrementally enhance transfer capability between the two RTOs, with a focus on both addressing nea…
The overall objective of this project is to complete a feasibility study for a Regional DAC Hub that encompasses the Pueblo region in the Colorado …
This EEC covers all maintenance activities performed by Savannah River Tritium Enterprise (SRTE) organizations that have the potential to disturb g…
Perform testing of a hydride-dehydride and casting (HYDEC) engineering development system installed in the 786-A engineering development laboratory…
Use gelatin to remove colloidal silica from aqueous salt simulants.…
This work is to inform design of larger scale experiments and provide a better understanding of the interactions between pyrophoric residue and fla…
CM 4443 Install flashing on east end at 711-1N.…
Installation of 14 New Cubes in 704-1N Room 117.…
The Control Room C-041 Monitoring and Control System DCS in Building 773-A will be upgraded by replacing the existing Programmable Logic Controller…