BEA is performing additional Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 and/or 2 on behalf of the U.S. Department of Energy (DOE). Th…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Racine (City), WI to develop, design, and install a solar photovoltaic (PV) carport system at the City's Bus Garage, incorporate energy efficiency upgrades, including advanced building control systems and installing light emitting diodes (LED) at multiple locations, and install energy conservation measures (EBCx), conduct existing building commissioning, and implement building performance design solutions at multiple locations.
WAPA is finishing the rebuild of Great Falls to Verona 161 kV. The rebuild will use 230 kV wood and Glued Laminated structures and add OPGW. Ther…
Bonneville Power Administration (BPA) proposes to perform soil sampling and geotechnical investigations to inform design details for potential site…
The MAGIS-100 experiment will be installed within the MINOS service building shaft. This project is to relocate existing infrastructure utilities t…
The Fermilab Technology Development Project aims to design, build, and operate an electron accelerator that meets the requirements specified by the…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes toconduct routine vegetation management along its North Gunnison - …
Non-slip matting will be installed on sample platform walkways at sample location FM-H1 on Crouch's Branch.…
The DWPF 291-S Zone 1 Stack Continuous Air Monitor (CAM) is comprised of a KURZ isokinetic sampler and VALTEC MOD V radiation monitoring system. Th…
Upgrade four obsolete S-Area/DWPF airborne radioactivity monitors located in 221-S on the Mezzanine Level. These four existing monitors will be con…