Replace 116 utility poles in place (with taller poles), transfer an existing medium voltage circuit, secondaries, and telecom equipment to the new …
A generator will be installed at 735-4B, the In Vivo Counting Facility, to provide emergency standby power in order to ensure continuous support fo…
Road 5 Milling, Paving, and Striping. Mill, pave and stripe Road 5 from Road 6 to Road C. Mill 3" of Road 5 and resurface with 1" Open Graded Inter…
This EEC covers stormwater outfall N-06 stormwater controls (oyster shell replacement) / maintenance (culvert repairs).…
Herpetology studies across SRS.…
The purpose of the experiment is to address the impacts of environmental stressors on aging trajectories in medaka. Work occurs across SREL laborat…
The Surface Analysis Laboratory project houses an x-ray photoelectrons spectrometer, which consists of a vacuum chamber with associated pumps and e…
Installation of three sets of new pole mounted fiber optic sensors, a new motor-operated three-way high-voltage switch with vacuum interrupter tech…
Troy Power and Light plans to replace old electric meters with new smart meters, attaching repeaters to existing power poles to establish a network…
BPA proposes to fund the Confederated Salish and Kootenai Tribes (CSKT) to implement Fencing, Vegetation Maintenance, and Structure Removal activit…