Bonneville Power Administration (BPA) proposes to install electronic equipment and fiber optic cable at Boardman and Morrow Flat substations, rebui…
Bonneville Power Administration (BPA) proposes to continue routine short-term power marketing actions to maintain reliability, optimize economic ou…
This revision is based on Aalo further defining areas needed to perform limited construction activities. The limited construction activities will r…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Rutgers University (RU) to develop an experimental setup that enables model-scale testing of certain types of hydrokinetic turbines (HKTs), develop a model-scale reference hydrokinetic turbine (rHKT), and the creation and dissemination of large raw and post-processed datasets.
The U.S. Department of Energy (DOE) proposes to lease 189 acres of real property (Batch 1 Property) at the Portsmouth Gaseous Diffusion Plant (PORTS) in Piketon, Ohio.
LM is proposing to complete chemical well redevelopment (CWR) actions at the Rifle Disposal Site (Site) in augmentation to the physical well develo…
Installation of new metal building in the former location of 773-69A and 773-70A.…
Install emergency lighting in 772-7B.…
An effort is being made to remove all nuclear safety blanks (NSBs) in H Canyon and installing blind flanges to create an air gap. An air gap provid…
Install the ADA technology at the Orsted Ford Ridge wind farm. The system will be designed to integrate with the plant's SCADA operational (OT) net…