The steam line that used to feed 706-H is still currently connected to the H-Area header, but there is no longer a need for the steam supply to tha…
Southwest Power Pool (SPP) issued a Notice to Construct to rebuild 4 miles of WAPAs existing 115kV transmission line from Gavins Point Substation t…
Perform renovations to the wellness room at 731-N.…
Repair ceiling insulation at 731-3N warehouse.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted an emergency structure replacement and access road repairs on its …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) proposes to complete asbestos abatement within the Beaver Creek Substation co…
The overall scope of this R and D activity is to carry out organic synthesis of small molecules and/or polymers to later be used in additive manufa…
Existing sump failed and will be replaced with like-for-like sump pump. Drawings will be updated to show the current field condition in addition to…
Install Beaver Cone at 731-N basin.…
Tornado shelters shall be installed in various places around F-Area to support the SRPPF project.…