This EEC covers the collection of biotic (animal tissue/blood) and abiotic (water, sediment) samples and their processing within the lab by solid p…
Western Area Power Administration (WAPA) proposes to repair the existing parking lot and road surfaces at the Bismarck Office, Bismarck Warehouse, …
This project would replace 4,100 feet of underground conductor that has reached its useful life and is starting to cause extended outages for our c…
This project will replace 42 aging and damaged utility poles and reconductor 144 spans of our distribution line.…
This work includes the modification, construction, installation and operation of equipment at the Wyoming Integrated Test Center (WITC) in Gillette…
Assembly and testing of Welltec's completions products including a Welltec Multi Set Isolation Tool and Straddle System.…
Carib Energy (USA) LLC (Carib Energy) filed an application with the Department of Energy’s (DOE) Hydrocarbons and Geothermal Energy Office on March 17, 2026.
Bonneville Power Administration (BPA) proposes to install a new 115-kilovolt (kV) power circuit breaker (PCB) and to complete additional equipment …
Bonneville Power Administration (BPA), along with the National Marine Fisheries Service (NMFS) Pacific Coastal Salmon Recovery Fund, proposes to fu…
Kentucky Utilities Company will install a SCR system to its coal-fired Unit 2 at Ghent Generating Station. The SCR system will be capable of reduci…