Nitric Acid piping will be installed that provides a transfer path from Tank TK-106 to Tank TK-304. A High-High Level Interlock action to stop Pump…
Premix Air Blender No. 1 Dust Collector (Z-205000-BMH-DCOL-0004) is in need of repair due to brief pressure excursion during normal operation.…
Vent 5 gas cylinders at 737-A.…
Preparation of doping metal oxide (aluminum (Al), chromium (Cr), iron (Fe), lithium (Li), nickel (Ni), molybdenum (Mo), titanium (Ti), tungsten (W)…
Reconductor existing overhead lines at river crossings, replacing bare conductor with covered conductor. In some locations will convert from under…
The U.S. Department of Energy (DOE) proposes to construct a Cryomodule Repair and Maintenance Facility (CRMF) at SLAC National Accelerator Laborato…
The project scope includes replacing approximately five circuit miles of outdated copper powerline conductor with new aluminum conductor. This proj…
The project shall consist of the design and installation of a new substation transformer as well as construction of storage pad for existing transf…
In-kind replacement of existing overhead top of pole electric cable, utilizing the majority of existing utility poles, replacing pole top conductor…
Vegetation management to minimize outage frequency and duration along Bromley Rd in Chester MA.…