Interstate Electrification Improvement CX(s) Applied: B5.1 Date: 07/23/2012 Location(s): New York Offices(s): National Energy Technology Laboratory
Modify the HB-Line Can Inerting System CX(s) Applied: B1.31 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Sample and Remove HEPA Filters from 690-N (Ford) Building CX(s) Applied: B1.23 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
A-Area Alternate Fire Water Supply CX(s) Applied: B1.3 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Remove and Dispose of 107 A & B Tanks and Support Structure CX(s) Applied: B6.1 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Hydrogen Charging Tritium Contaminated Metals CX(s) Applied: B3.6 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Hills Creek-Lookout Point No. 1 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
St. Petersburg Solar Pilot Project CX(s) Applied: B5.1 Date: 07/19/2012 Location(s): Florida Offices(s): Golden Field Office
Schultz-Raver No.1 Right-Of-Way Marking Project CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Olympia-Grand Coulee Structure 85/5 Relocation Project CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration