Pilot Scale Hanford Mixing Studies with Cohesive Simulants, Phase III, and Solids Accumulation Scouting Studies CX(s) Applied: B3.6 Date: 07/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Operation of 3013 Outer Can Welder (OCW) CX(s) Applied: B1.3 Date: 07/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Oregon State University- Natural Gas Self-contained Home Filling Station CX(s) Applied: B3.6 Date: 07/25/2012 Location(s): Oregon, Colorado, Michigan Offices(s): Advanced Research Projects Agency-Energy
Buildings 12-64/12-84 Electrical Equipment Installation CX(s) Applied: B1.3, B1.15 Date: 07/25/2012 Location(s): Texas Offices(s): Pantex Site Office
Advance Manufacture of Second-surface, Silvered Glass Reflectors for High Performance, Low-cost Concentrated Solar Power Collector Systems CX(s) Applied: B3.6 Date: 07/25/2012 Location(s): Arizona Offices(s): Golden Field Office
Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System CX(s) Applied: B5.1 Date: 07/25/2012 Location(s): Arkansas Offices(s): Golden Field Office
Midway Substation 230 Kilovolt Upgrades El Paso County, Colorado CX(s) Applied: B4.6, B4.11 Date: 07/25/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Deactivation and Decommissioning of the D-Area Detritiation Cells and Relocation of Associated Handi-Houses CX(s) Applied: B1.23 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Characterization of Downgradient Volatile Organic Compounds Plume and Installation of Monitoring Well CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Installation of Sentinel Wells ASB011B/011C for A-2 Air Stripper Shutdown CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office