Re-work Bryan Mound 30” Crude Oil Pipeline Mainline Valves CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Replacement Anode Bed on West Hackberry 42-inch Crude Oil Pipeline at Gum Cove Road CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Alcova-Casper North 115 Kilovolt Transmission Line Pole Replacements CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Mission Support Alliance Shutdown of Waste Sampling and Characterization Facility CX(s) Applied: B1.28 Date: 04/10/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Minnesota City-Apple Valley CX(s) Applied: B1.32, B2.5, B5.1 Date: 04/10/2012 Location(s): Minnesota Offices(s): Energy Efficiency and Renewable Energy
California City-Gardena CX(s) Applied: A9, B2.5, B5.1 Date: 04/10/2012 Location(s): California Offices(s): Energy Efficiency and Renewable Energy
Installation of Glovebox in 773-A CX(s) Applied: B3.6 Date: 04/10/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Power Supply poles for Savannah River National Laboratory trailer CX(s) Applied: B2.5 Date: 04/10/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Michigan City-Canton, Charter Township of CX(s) Applied: A9, B1.32, B5.1 Date: 04/09/2012 Location(s): Michigan Offices(s): Energy Efficiency and Renewable Energy
Groundwater Monitoring Well Abandonment and Installation at the Mixed Waste Management Facility CX(s) Applied: B3.1 Date: 04/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office