Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards for Battery Chargers and External Power Supplies CX(s) Applied: B5.1 Date: 01/05/2012 Location(s): Nationwide Offices(s): Energy Efficiency and Renewable Energy
Dynamic Compression Sector (DCS) project at Advanced Photon Source CX(s) Applied: B3.6 Date: 01/05/2012 Location(s): Illinois Offices(s): Science, Argonne Site Office
Limited Firebreak Maintenance on the Hanford Site During Calendar Year 2012 CX(s) Applied: B1.3 Date: 01/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Routine Shipping and Transportation of Regulated and Non-Regulated Material, Equipment, or Waste On and Off the Hanford Site CX(s) Applied: B1.30 Date: 01/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Oklahoma State Energy Program American Recovery and Reinvestment Act - Oklahoma Municipal Power Authority Large Systems Request AB CX(s) Applied: B5.19 Date: 01/05/2012 Location(s): Oklahoma Offices(s): Golden Field Office
Oklahoma State Energy Program American Recovery and Reinvestment Act - Oklahoma Municipal Power Authority Large Systems Request AA CX(s) Applied: B5.19 Date: 01/05/2012 Location(s): Oklahoma Offices(s): Golden Field Office
Test Procedures for Measuring Energy Efficiency of Consumer Products and Industrial Equipment CX(s) Applied: A5, A6 Date: 01/05/2012 Location(s): Nationwide Offices(s): Energy Efficiency and Renewable Energy
Notice of Proposed Rulemaking for( Energy Conservation Standards for Metal Halide lamp Fixtures CX(s) Applied: B5.1 Date: 01/04/2012 Location(s): Nationwide Offices(s): Energy Efficiency and Renewable Energy
Line Relocation Project for Farrell Cooper Mining Company CX(s) Applied: B4.13 Date: 01/04/2012 Location(s): Oklahoma Offices(s): Southwestern Power Administration
Heavy Duty Roots Expander Heat Energy Recovery CX(s) Applied: A1, A9 Date: 01/04/2012 Location(s): Iowa Offices(s): National Energy Technology Laboratory