Pave a Parking Space Near Building 730-A CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Ambler Boiler House Geothermal Wells, Cool Roof and Photovoltaic installation CX(s) Applied: B5.1, B5.16, B5.19 Date: No date. Location(s): Pennsylvania Offices(s): Golden Field Office
Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
"Prototype Development and Evaluation of Self-Cleaning Concentrated Solar Power Collectors and Receivers CX(s) Applied: B3.6, B5.17 Date: 08/06/2012 Location(s): Massachusetts Offices(s): Golden Field Office"
Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel Government Furnished Equipment CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Proliferation Detection Research for Discovery and Development of Process for Deposition of Pure, Stoichiometric and Conformal Films of Magnesium Diboride at Harvard University CX(s) Applied: A9, A11, B3.6 Date: 08/06/2012 Location(s): Massachusetts O...
Notice of Proposed Rulemaking for Energy Conservation Standards for Distribution Transformers CX(s) Applied: B5.1 Date: No date Location(s): Nationwide Offices(s): Energy Efficiency and Renewable Energy
Heliostat System with Wireless Closed-Loop Control CX(s) Applied: B3.6 Date: 08/06/2012 Location(s): California Offices(s): Golden Field Office
CH2MHill Plateau Remediation Company - Asbestos Removal Actions CX(s) Applied: B1.16 Date: 08/03/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Remove the Highpoint VAMP ED-641000-IT-RISH-6097A From Service CX(s) Applied: B2.2 Date: 08/03/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office