Coolidge Substation Southeast Corner Gate and Fence Relocation Project CX(s) Applied: B1.11 Date: 01/18/2012 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Rhode Island Utility Scale Renewable Energy Initiative CX(s) Applied: A1, A9, B3.1 Date: 01/17/2012 Location(s): Rhode Island Offices(s): National Energy Technology Laboratory
Construction of Interagency Fire Center at TA-49 CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): New Mexico Offices(s): Los Alamos Site Office
Big Hill Vacuum Truck CX(s) Applied: B1.3 Date: 01/17/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Kentucky-County-Kenton CX(s) Applied: B2.5, B5.1 Date: 01/17/2012 Location(s): Kentucky Offices(s): Energy Efficiency and Renewable Energy
Copper Catalyzed peroxide Destruction of Tank 48H Tetraphenylborate Wastes CX(s) Applied: B3.6 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Construction of 37 Parking Spaces South of 251-4F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Parking Lot Construction North of Pad 717-14F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Laboratory Demonstration of a New American Low-Head Hydropower Turbine CX(s) Applied: B3.6 Date: 01/17/2012 Location(s): Illinois Offices(s): Golden Field Office
Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.22 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office