SiC-SiC Composite for Fuel Structure Applications – Electric Power Research Institute CX(s) Applied: B3.6 Date: 08/09/2012 Location(s): CX: none Offices(s): Nuclear Energy
High Flux Microchannel Solar Receiver Development with Adaptive Flow Control CX(s) Applied: B3.6, B5.17 Date: 08/08/2012 Location(s): Oregon Offices(s): Golden Field Office
Laydown Yard Expansion East of 706-1F CX(s) Applied: B1.15 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Sno-King Substation Expansion CX(s) Applied: B4.11 Date: 08/08/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Disposition of Mountain Avenue Tap Line Sectionalizing Switches CX(s) Applied: B1.24 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Celilo Converter Station Curtain Wall Replacement CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Pittsburgh Guard Shack Replacement CX(s) Applied: B1.23, B1.24 Date: 08/08/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Building 720-2A Chiller Replacement CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
New Drainage Near E-004 Basin CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Pad 16 Perimeter Paving CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office