"A New Method for Low-cost Production of Titanium Alloys for Reducing Energy Consumption of Mechanical Systems CX(s) Applied: A9, B3.6 Date: 08/14/2012 Location(s): Utah Offices(s): Golden Field Office"
Drainage System Work Near 772-1F CX(s) Applied: B1.3 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Tank 16 Annulus Cleaning Demonstration CX(s) Applied: B3.6 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Roof Repair at 105-C Disassembly CX(s) Applied: B1.3 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Analytical Support for Alternate Feed Stock-2 (AFS-2) CX(s) Applied: B3.6 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Well Abandonment and Replacement Well Installation in N-Area CX(s) Applied: B3.1 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Sludge Batch 8 Qualification: Washing and Defense Waste Processing Facility Simulations (Rad) CX(s) Applied: B3.6 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Wind Tower Cathodic Protection CX(s) Applied: B1.19 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Catalyst Characterization CX(s) Applied: B3.6 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dredging of the West Hackberry Raw Water Intake Structure CX(s) Applied: B1.3 Date: 08/14/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office