Petrography Laboratory CX(s) Applied: B3.6 Date: 08/01/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Multi-Phase Fluid Flow Simulation Assisted Exploration and Production of Hydrocarbons from Niobrara… CX(s) Applied: B3.6 Date: 08/01/2012 Location(s): South Dakota Offices(s): National Energy Technology Laboratory
Siting, Modifying and Operating Support Buildings CX(s) Applied: B1.15 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Georgia-City-Columbus CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1 Date: 08/01/2012 Location(s): Georgia Offices(s): Energy Efficiency and Renewable Energy
Safety Environmental Improvements 300 Area CX(s) Applied: B2.5 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Cutters Grove, Anoka CX(s) Applied: A9, B5.19 Date: 07/31/2012 Location(s): Minnesota Offices(s): Golden Field Office
Massachusetts-City-Malden CX(s) Applied: A9, A11, B1.32, B5.1 Date: 07/31/2012 Location(s): Massachusetts Offices(s): Energy Efficiency and Renewable Energy
Colorado-County-Douglas CX(s) Applied: A1, A9, A11, B1.32, B5.1 Date: 07/31/2012 Location(s): Colorado Offices(s): Energy Efficiency and Renewable Energy
Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration