Montrose Operations Center Asphalt Overlay Project CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Line Switch Replacements at Guernsey Rural, Worland, Refinery, Box Butte, and Morrill Taps CX(s) Applied: B4.6, B4.11 Date: 07/30/2012 Location(s): Wyoming, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region
Hydroelectric Power Rate Increase for the Robert Douglas Willis Hydropower Project CX(s) Applied: B4.3 Date: 07/30/2012 Location(s): Texas, Texas, Texas Offices(s): Southwestern Power Administration
Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
Demonstration of Gas Powered Drilling Operations for Economically-Challenged Wellhead Gas and Evaluation CX(s) Applied: B3.6 Date: 07/26/2012 Location(s): North Dakota Offices(s): National Energy Technology Laboratory
Energy Regional Innovation Cluster CX(s) Applied: B3.6, B5.1 Date: 07/26/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Photovoltaic Solar Demonstration Project Energy Efficiency and Conservation Block Grant Program-City of EI Paso, Texas CX(s) Applied: A9, B3.14, B5.16 Date: 07/26/2012 Location(s): Texas Offices(s): Golden Field Office
Splicing of 480 VAC Cathodic Protection Power Cables CX(s) Applied: B2.5 Date: 07/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Removal of Out-of-Service Railroad Segment CX(s) Applied: B1.23 Date: 07/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Big Hill Recycle Line Repair CX(s) Applied: B1.3 Date: 07/26/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office