Oneida Nation Energy Optimization Model Development Project CX(s) Applied: B3.6, B3.8 Date: 07/17/2012 Location(s): Wisconsin Offices(s): Golden Field Office
Remanufacture, Transport, and Install BHTX-29 Transformer CX(s) Applied: B1.3 Date: 07/17/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Ultra-Deepwater Dry Tree System for Drilling & Production in the Gulf of Mexico - Phase 2 CX(s) Applied: A9, B3.6 Date: 07/17/2012 Location(s): Texas, Canada Offices(s): National Energy Technology Laboratory
Routine Maintenance CX(s) Applied: B1.3, B1.4, B1.8, B1.16, B1.17 Date: 07/16/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office
Solar Decathlon 2013 CX(s) Applied: A9, A11, B5.1 Date: 07/16/2012 Location(s): California Offices(s): Golden Field Office
F-Area Infrasturcture Improvement CX(s) Applied: B1.23 Date: 07/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Building 1 Renovation CX(s) Applied: B1.15, B1.16, B2.1, B2.2, B2.5 Date: 07/16/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Northeast Provider of Solar Instructor Training - North CX(s) Applied: A9, A11, B5.16 Date: 07/16/2012 Location(s): Maine Offices(s): Golden Field Office
Ohio Advanced Transportation Partnership - Electrical Vehicle Supply Equipment Installation in Walgreens Parking Lot CX(s) Applied: B5.23 Date: 07/16/2012 Location(s): Ohio Offices(s): National Energy Technology Laboratory
Add Redundant Safety Significant Relief Valve to 773-2A CX(s) Applied: B2.5 Date: 07/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office