High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Disposition of Mountain Avenue Substation and Tap Line CX(s) Applied: B1.24 Date: 07/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Big Eddy – Troutdale No. 1 230 Kilovolt Transmission Line Upgrade CX(s) Applied: B4.13 Date: 07/11/2012 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration
Metaline Radio Station Upgrade Project CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Shaniko Radio Station Replacement Project CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
SkyFuel Baseload Parabolic Trough CX(s) Applied: B3.6, B5.15 Date: 07/11/2012 Location(s): Colorado Offices(s): Golden Field Office
Compressed Natural Gas (CNG)/Infrastructure Development (New Station) CX(s) Applied: B5.22 Date: 07/11/2012 Location(s): Utah Offices(s): National Energy Technology Laboratory
Ohio Advanced Transportation Partnership - Installation of Electric Vehicle Supply Equipment at The Ohio State University Campus CX(s) Applied: B5.23 Date: 07/11/2012 Location(s): Ohio Offices(s): National Energy Technology Laboratory
Tie pH Adjustment System to 901-F Service Water System CX(s) Applied: B1.3 Date: 07/11/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dismantle and removal (D&R) of Domestic Water (DW) & Process Water (PWS) heater tanks CX(s) Applied: B1.3 Date: 07/11/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office