B-2 Area 40 Office Reconfiguration CX(s) Applied: B2.1 Date: 12/06/2011 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Energy Efficiency Retrofits and Renewable Energy Activity CX(s) Applied: B5.1, B5.18 Date: 12/06/2011 Location(s): Texas Offices(s): Energy Efficiency and Renewable Energy
Clean Start - Development of a National Liquid Propane Refueling Network CX(s) Applied: B5.22 Date: 12/06/2011 Location(s): Arizona Offices(s): National Energy Technology Laboratory
300 Area Nanoscale Research and Development Projects CX(s) Applied: B3.15, A9, B3.6 Date: 12/06/2011 Location(s): Washington Offices(s): River Protection-Richland Operations Office
City of Las Vegas Electric Vehicle Program CX(s) Applied: A1 Date: 12/06/2011 Location(s): Nevada Offices(s): National Energy Technology Laboratory
Extreme Balance of System Hardware Cost Reductions (BOS·X) CX(s) Applied: A9, B3.6 Date: 12/05/2011 Location(s): Pennsylvania Offices(s): Golden Field Office
Michigan State University - Transformer-less Unified Power Flow Controller for Wind and Solar Power Transmission CX(s) Applied: B3.6 Date: 12/05/2011 Location(s): Michigan Offices(s): Advanced Research Projects Agency-Energy
Chromatin Inc. - Plant Based Sesquiterpene Biofuels CX(s) Applied: B3.6 Date: 12/05/2011 Location(s): Kansas, Kentucky, Illinois, Ohio Offices(s): Advanced Research Projects Agency-Energy
Associated Electric Cooperative, Inc. Substation Improvements CX(s) Applied: B4.6 Date: 12/05/2011 Location(s): Missouri Offices(s): Southwestern Power Administration
Record of Categorical Exclusion for Repair Erosion Problems at Big Hill Raw Water Intake Structure CX(s) Applied: B1.3 Date: 12/05/2011 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office