Grant New Cingular Wireless’ request for use of right-of-way at the Salem Substation CX(s) Applied: B4.9 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Sanford Underground Research Facility CX(s) Applied: B2.1; B3.6 Date: 12/01/2011 Location(s): South Dakota Offices(s): Berkeley Site Office
Energy Retrofits CX(s) Applied: B5.1 Date: 12/01/2011 Location(s): Nationwide Offices(s): Energy Efficiency and Renewable Energy
Energy Retrofits CX(s) Applied: B5.1 Date: 12/01/2011 Location(s): Nationwide Offices(s): Energy Efficiency and Renewable Energy
Energy Retrofits CX(s) Applied: B5.1 Date: 12/01/2011 Location(s): Rhode Island Offices(s): Energy Efficiency and Renewable Energy
Energy Retrofits CX(s) Applied: B5.1 Date: 12/01/2011 Location(s): Kentucky Offices(s): Energy Efficiency and Renewable Energy
DeSoto Photovoltaic Variability Study CX(s) Applied: B3.1, A9, B1.11 Date: 12/01/2011 Location(s): Florida Offices(s): Golden Field Office
Innovative Computational Tools for Reducing Exploration Risk Through Integration of Water-rock Interactions and Magnetotelluric Surveys CX(s) Applied: A9, B3.6 Date: 12/01/2011 Location(s): Utah Offices(s): Golden Field Office
Solar-assisted, Electrical Vehicle Charging Stations in Nashville, Tennessee CX(s) Applied: B5.23 Date: 12/01/2011 Location(s): Tennessee Offices(s): Oak Ridge Office
Geothermal Technology Advancement for Rapid Development of Resources in the U.S. CX(s) Applied: A9, B3.2, B3.11 Date: 11/30/2011 Location(s): Texas Offices(s): Golden Field Office