Categorical Exclusion (CX) Determinations By Date

Ambler Boiler House Geothermal Wells, Cool Roof and Photovoltaic installation CX(s) Applied: B5.1, B5.16, B5.19 Date: 02/08/2012 Location(s): Pennsylvania Offices(s): Golden Field Office
Upgrade of the Existing Septic System at the Redmond Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Sampling of Legacy Material for Material, Control & Accountability (MC&A) Verification CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office