Additional Characterization Sampling at the Coal Pile Ash Basin 788-3A and the Ash Pile 788-A CX(s) Applied: B3.1 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Saltstone Disposal Facility, Vault 4, East Side Drain Water Collection and Return System, Temporary Modification CX(s) Applied: B1.3 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Saltstone Disposal Facility, Vault 4, East Side Drain Water Collection and Return System, Temporary Modification CX(s) Applied: B1.3 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Permanent Power for Saltstone Disposal Unit Construction CX(s) Applied: B4.6 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Characterization of Process Solutions and Solids CX(s) Applied: B3.6 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
DOE-GM Partnership for a Joint U.S. India Jatropha Biodiesel Research Project CX(s) Applied: A9, B3.6 Date: 03/05/2013 Location(s): Michigan Offices(s): Golden Field Office
Wilson Landslide Stabilization Project Lawrence Berkeley National Laboratory CX(s) Applied: B1.3; B1.13; B3.1 Date: 03/01/2013 Location(s): California Offices(s): Berkeley Site Office
University of Wisconsin-Baraboo/Sauk County Net-Zero Energy Building CX(s) Applied: A9, B3.1, B5.16, B5.1 Date: 02/28/2013 Location(s): Wisconsin Offices(s): Golden Field Office
Program Year 2012 State Energy Program - Formula Grant CX(s) Applied: A9, A11, B5.1 Date: 02/28/2013 Location(s): Wisconsin Offices(s): Golden Field Office
Hydrogen Pathway Analyses CX(s) Applied: A9 Date: 02/28/2013 Location(s): Virginia Offices(s): Golden Field Office