Fairmount Substation Equipment Acquisition CX(s) Applied: B1.24 Date: 03/27/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Abandon-In-Place Four Cell Extensions Located at Seven Spings Laydown Yard CX(s) Applied: B1.23 Date: 03/27/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Humate Injection CX(s) Applied: B3.1 Date: 03/26/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Capitol Building Air Handling Unit Replacement CX(s) Applied: A9, B5.1 Date: 03/25/2013 Location(s): South Dakota Offices(s): Golden Field Office
The South Bend Public Transportation corporation Bus Operations Center and Maintenance Center, South Bend CX(s) Applied: A9, B5.22 Date: 03/25/2013 Location(s): Indiana Offices(s): Golden Field Office
Hawaii Renewable Energy Development Venture CX(s) Applied: B5.18 Date: 03/25/2013 Location(s): Hawaii Offices(s): Golden Field Office
Lease of Office Space to support Waste Isolation Plant activities CX(s) Applied: B1.24 Date: 03/25/2013 Location(s): New Mexico, New Mexico Offices(s): Carlsbad Field Office
Install Rip Rap Along Stream Bank at Two Wood Pole Structures Located Along the Bell-Boundary No. 3 Transmission Line CX(s) Applied: B1.3 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Revenue Meter Replacement at Franklin County Public Utility District’s (PUD) Taylor Flats Substation CX(s) Applied: B1.7 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration