Categorical Exclusion (CX) Determinations By Date

Provide an Improved Heating, Ventilation and Air Conditioning System in 705-A CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): Oregon, Oregon, Washington, Montana, Montana Offices(s): Bonneville Power Administration
Shipping Containers 9975, 9977 and 9978 Annual Maintenance and Testing CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Establish Digital Density Meter Analytical Capability in 735-A, D-wing CX(s) Applied: B3.6 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Strategic Petroleum Reserve Site Workover Support Activities, 2016-2020 CX(s) Applied: B5.12 Date: 01/07/2013 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office
Developing Gas Stripping, Catalytic Fast Pyrolysis Conversion of Corn Stover to Drop-in Quality Hydrocarbons CX(s) Applied: A9, B3.6 Date: 05/09/2013 Location(s): South Dakota Offices(s): Golden Field Office
Well #ASH-06 Tie-In to A-Area Burning Rubble Pit (ABRP) Soil Vapor Extraction Unit (SVEU) CX(s) Applied: B6.1 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Permanent Power for MCU Sampling Building Heating, Ventilation and Air Conditioning and Ancillary CX(s) Applied: B2.5 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Installation of Power Rack in Blast Resistant Enclosures (BREs) 3 Through 8 CX(s) Applied: B2.1 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office