Eastslde Renovation ProjectZooe 2 (f-1·2) CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 03/13/2014 Location(s): Wyoming Offices(s): RMOTC
Easts Ide Renovation Project Zone 1-Revision (T-1-11) CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 03/13/2014 Location(s): Wyoming Offices(s): RMOTC
Revenue Meter Replacement at Benton County Public Utility District’s (PUD) Finley Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Revenue Meter Replacement at Oregon Trail Electric Co-op’s (OTEC's) West John Day Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
University of California Santa Cruz- Adiabatic Waveguide Coupler for High-Power Solar Energy Collection, Photovoltaic Conversion and Transmission CX(s) Applied: B3.6 Date: 03/12/2013 Location(s): California, California, California, California, Colorad...
235-F Risk Reduction and Deactivation CX(s) Applied: B1.28 Date: 03/12/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Land Mobile Radio - Bi Directional Amplifier (BDA) Installation CX(s) Applied: B1.7 Date: 03/21/2013 Location(s): Idaho Offices(s): Nuclear Energy
Georgia Institute of Technology- Electric Power Generation by a Vertical-Axis Turbine Driven by an Anchored Vortex and Sustained by the Air Layer over Solar-Heated Ground CX(s) Applied: B3.6, B5.15 Date: 03/11/2013 Location(s): Georgia, Texas, Illinoi...
Power Generation Using Anchored, Buoyancy-Induced Columnar Vortices: The Solar Vortex (SoV) CX(s) Applied: B3.6, B5.15Date: 03/11/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Correct Obstruction in the Sprinkler System on Level 3 of HB-Line CX(s) Applied: B2.5 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office