Capitol Building Air Handling Unit Replacement CX(s) Applied: A9, B5.1 Date: 03/25/2013 Location(s): South Dakota Offices(s): Golden Field Office
The South Bend Public Transportation corporation Bus Operations Center and Maintenance Center, South Bend CX(s) Applied: A9, B5.22 Date: 03/25/2013 Location(s): Indiana Offices(s): Golden Field Office
Hawaii Renewable Energy Development Venture CX(s) Applied: B5.18 Date: 03/25/2013 Location(s): Hawaii Offices(s): Golden Field Office
Lease of Office Space to support Waste Isolation Plant activities CX(s) Applied: B1.24 Date: 03/25/2013 Location(s): New Mexico, New Mexico Offices(s): Carlsbad Field Office
Install Rip Rap Along Stream Bank at Two Wood Pole Structures Located Along the Bell-Boundary No. 3 Transmission Line CX(s) Applied: B1.3 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Revenue Meter Replacement at Franklin County Public Utility District’s (PUD) Taylor Flats Substation CX(s) Applied: B1.7 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Categorical Exclusion Determination
Wenatchee District Wood Pole Replacements CX(s) Applied: B1.3 Date: 03/22/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Appledorn Substation Construction CX(s) Applied: B4.11 Date: 03/22/2010 Location(s): Minnesota Offices(s): Western Area Power Administration-Upper Great Plains Region
Generating Electricity from Waste Heat Using Metal Hydrides CX(s) Applied: B3.6Date: 03/21/2013 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy