Texas Alternative Fuel Vehicle Pilot Program CX(s) Applied: A1, B5.1 Date: 05/22/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Analytical Sample Preparation Laboratory CX(s) Applied: B3.6 Date: 05/22/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
High Temperature Laboratory CX(s) Applied: B3.6 Date: 05/22/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Line 3002 and 3002A Electrical Transmission Line Reconductoring Project CX(s) Applied: B2.5 Date: 05/22/2013 Location(s): Missouri, Missouri Offices(s): Southwestern Power Administration
Sludge Batch 8 (SB8) Waste Acceptance Product Specifications (WAPS) CX(s) Applied: B3.6 Date: 05/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Characterization of Process Solutions and Solids CX(s) Applied: B3.6 Date: 05/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Salt Batch 7 Qualification CX(s) Applied: B3.6 Date: 05/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Eugene Substation Fiber Interconnection CX(s) Applied: B4.7 Date: 05/21/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Eastern Colorado Field Office Com Buildings Removal CX(s) Applied: B1.22, B1.23, B1.24 Date: 05/20/2013 Location(s): Colorado, Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Fracture Evolution Following Hydraulic Stimulations within EGS Reservoirs CX(s) Applied: A9, B3.1, B3.6 Date: 05/20/2013 Location(s): Utah Offices(s): Golden Field Office