Oracle to Tucson 115 Kilovolt Transmission Line, Cross Arm Replacements at Structure 2/5 and 7/3 CX(s) Applied: B1.3 Date: 05/02/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Energy Efficiency and Conservation Block Grant Program- City of Fort Lauderdale, Florida CX(s) Applied: B5.1, B5.16 Date: 05/02/2013 Location(s): Florida Offices(s): Golden Field Office
A 1,000 Level Drill Pipe Deployed Fiber Optic 3C Receiver Array for Deep Boreholes CX(s) Applied: A9, A11, B3.6 Date: 04/30/2013 Location(s): California Offices(s): National Energy Technology Laboratory
A 1,000 Level Drill Pipe Deployed Fiber Optic 3C Receiver Array for Deep Boreholes CX(s) Applied: A9, A11, B3.6 Date: 04/30/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
A 1,000 Level Drill Pipe Deployed Fiber Optic 3C Receiver Array for Deep Boreholes CX(s) Applied: A9, B3.6 Date: 04/30/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Road Maintenance and Brushwork along the Saguaro-Tucson 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/30/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Franklin-Badger Canyon #2 & Walla Walla-Pendleton #1 Wood Poles CX(s) Applied: B1.3 Date: 04/30/2013 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration
Widen F-Area Inner Loop Road CX(s) Applied: B1.32 Date: 04/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Convert Forms Monitor to Stack Monitor in H-Area Old Manufacturing CX(s) Applied: B2.2 Date: 04/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Add Blanks in Central Hood Exhaust (CHEX) Ductwork Between FLT-14 and FLT-15 and Between FLT-31 and FLT-32 CX(s) Applied: B2.3 Date: 04/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office