Monroe Substation Integrated Project CX(s) Applied: B4.11 Date: 05/08/2013 Location(s): Washington Offices(s): Bonneville Power Administration
South Table Mountain Energy Systems Integration Facility Hydrogen Fueling Station CX(s) Applied: B1.15 Date: 05/08/2013 Location(s): Colorado Offices(s): Golden Field Office
735-A, D-Wing, Main Floor - ARGUS Halon Suppression System Replacement CX(s) Applied: B2.5 Date: 05/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Silicon Power Corporation - Optically-Switched 15-kilovolt SiC Single-Bias High-Frequency Thyristor CX(s) Applied: B3.6 Date: 05/07/2013 Location(s): New York, Pennsylvania, North Carolina, Illinois Offices(s): Advanced Research Projects Agency-Energy
2013 B17 Renovation CX(s) Applied: B1.4, B1.15, B1.31, B2.1 Date: 05/03/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Improved Mobility Control in Carbon Dioxide Enhanced Recovery Using SPI Gels CX(s) Applied: B3.11 Date: 05/03/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Thermal Barrier Coatings for the LTC Engine – Heat Loss, Combustion, Thermal vs. Catalytic Effects CX(s) Applied: A9, B3.6 Date: 05/03/2013 Location(s): California, South Carolina, Connecticut Offices(s): National Energy Technology Laboratory
Development of a Dynamic Wall Layer Model for LES of Internal Combustion Engines CX(s) Applied: A9, B3.6 Date: 05/03/2013 Location(s): California, Michigan Offices(s): National Energy Technology Laboratory
Building For Re-Roofing Project CX(s) Applied: B1.23, B2.1, B2.5 Date: 05/03/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Modification to the Petrography Laboratory CX(s) Applied: B2.3, B3.6 Date: 05/03/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory