Convert 15 ABRP Wells From the Active SVE System to Microblower Baroball SVE and Convert Two Dry A-Area Groundwater Monitoring Wells to SVE Operation CX(s) Applied: B6.9Date: 04/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations O...
Office of NEPA Policy and Compliance
April 29, 2015Convert 15 ABRP Wells From the Active SVE System to Microblower Baroball SVE and Convert Two Dry A-Area Groundwater Monitoring Wells to SVE Operation
CX(s) Applied: B6.9
Date: 04/29/2015
Location(s): South Carolina
Offices(s): Savannah River Operations Office
The proposed action is modification of the A Area Burning/Rubble Pits (ABRP) Soil Vapor Extraction (SVE) System. Active SVE wells will be converted to passive SVE (Ref M-FCR-A-00057). Dry A-Area groundwater monitoring wells (2) will be converted to SVE operation (Rev. M-SOW-A- 00089). ABRP wells (15) will be converted from the active SVE system to Microblower Baroball SVE.