Materials and Fuel Complex-752 Analytical Laboratory Main Stack Modifications for Sample Probe Replacement CX(s) Applied: B2.2Date: 05/11/2015 Location(s): IdahoOffices(s): Idaho Operations Office
Office of NEPA Policy and Compliance
May 11, 2015Materials and Fuel Complex-752 Analytical Laboratory Main Stack Modifications for Sample Probe Replacement
CX(s) Applied: B2.2
Date: 05/11/2015
Location(s): Idaho
Offices(s): Idaho Operations Office
The proposed action is to install two 4" inspection/velocity traverse ports approximately 2' below the existing sample probe port as part of the engineering job (EJ-1684) and to replace the existing sample probe with a new one (that will sample isokinetically).